Page 207 - Building Regulation Design Guidelines - Architecture Book (Blue Code)
P. 207

SEcTION  19  REFUSE DISPOSAL REQUIREMENTS                                 SEcTION: 19  REFUSE DISPOSAL REQUIREMENTS







                19.1  GARBAGE ROOMS AND cOLLEcTION AREAS                                                 19.1.4   In buildings with an area exceeding 180.0 square meters, garbage
                                                                                                                rooms shall be provided as below table-26:
                     19.1.1  All types of buildings shall be provided with a garbage collection
                           point within the plot limits or a garbage room at the ground floor                    Rubbish Amount      Room Accommodate below
                           level of the building for garbage collection purposes.                                     (Kg)              Dumpsters Number

                     19.1.2  The garbage room specifications are as follows:-
                                                                                                                    Up to 100    One Dumpster, 1.1 *(m3) Capacity.
                           19.1.2.1  It shall be located close to the adjacent road or alleyway,
                                  if there is  no service  route to facilitate  removing the                        Up to 250   One Dumpster, 2.5 *(m3) Capacity
                                                                                                                                Or Two Dumpsters 1.1 *(m3) each.
                                  containers and transporting them to the garbage
                                  collection vehicles.                                                              Up to 500   Two Dumpsters, 2.5 *(m3) Capacity each.

                           19.1.2.2  It shall have a door with a minimum width of 1.8
                                  meter, rust proof with louvers or any other mechanical                            Up to 750   Three Dumpsters, 2.5 *(m3) Capacity each.
                                  ventilation that opens outwards leading to the garbage                           Up to 1,000   Four Dumpsters, 2.5 *(m3) Capacity each.
                                  loading area. (figure -80)
                                                                                                                                The number of garbage rooms is decided
                           19.1.2.3  The minimum height of the garbage room shall be 2.4                                        according to special study requirements
                                  meters.                                                                        More than 1,000  or calculating the same averages as
                                                                                                                                above for half of the volume that exceeds
                           19.1.2.4  It shall have a water supply directly connected to the                                     1,000 Kg.
                                  network or from the distribution (pumping) tank.
                                                                                                                    Table-26   Garbage Room Size via Rubbish Amount
                           19.1.2.5  It shall be connected to the building’s drainage network.

                           19.1.2.6  It shall be provided with adequate lighting and ventilation         19.1.5   The standard measurements for the garbage room areas are as
                                  system.                                                                       follows: (figure-80)

                           19.1.2.7  All windows shall be airtight and protected by a metal                      19.1.5.1 There should be at least 0.3 meter of clear space between
                                  mesh wire screen in order to prevent insects and rodents                            the dumpsters and the wall of the garbage room.
                                  from getting into the room.
                                                                                                                19.1.5.2  There should be at least 0.3 meter distance between
                           19.1.2.8  Floors and walls shall be ceramic tiles, for easy cleaning.                      one dumpster and the other, on all directions.

                     19.1.3   In buildings with an area less than 180.0 square meters, garbage                  19.1.5.3 There should be a minimum space of 0.6 meter between
                            room of 1.2 x 1.8 meter with minimum door width of 0.9 meter,                             the dumpster and the door location.
                            automatic closing with mechanical ventilation shall be provided                     19.1.5.4 The minimum internal corridor width of the garbage room
                            at the ground floor level only.
                                                                                                                      shall be 1.2 meter.

                                                                                                    *m3 = cubic meters