Page 53 - Building Regulation and Design Guidelines - Structural (Grey Code)
P. 53

SECTION: 3  GUIDELINES FOR PRE STRESSED CONCRETE WORKS (SLABS)                       SECTION: 3   GUIDELINES FOR PRE STRESSED CONCRETE WORKS (SLABS)




               Design Considerations:                   Plate with deformed bar                                                                    Reinforcement grouted
                                                        anchor grouted in                             Design Considerations:                       in slab keyway
                 Can transfer diaphragm shear           slab keyway                                                                                        Topping if
                 Can provide lateral brace for beam                                                      Can transfar diaphragm shear  Longitudinal        required
                 Potential to develop negative moment in slabs      Topping if                           Can be designed as structural inegrity tie
                                                                    required                                                             bar as req'd.
                                                                                                      Fabrication Considerations:
               Fabrication Considerations:                                                               Clean and simple for both beam and slabs
                                                                                                         Dowels from beam may present safety hazard
                 Plates in beam must align with slab joints
                 allowing tolerance                                                                   Erection Considerations:
                                                                                                                                                         Bearing
                                                                                                         Reinforcement must be tied in place             strip
                                                                                                         Concrete must be cast around reinforcement
                                              Plate with beaded      Bearing                             Edge form is required for cast-in-place concrete
               Erection Considerations:                stud anchors  strip                                                             P.C. or C.I.P.
                                                                                                                                             concrete
                                                                                                         Dowels from beam may present safety hazard
                 Connection can be completed with a follow-up                                                                                     beam
                 crew                             P.C. or C.I.P.                                                                                 Fig.  5.3.11
                 Lateral bracing for beam will not be provided          concrete
                 until keyway grout cures
                                                               beam                                                                                Weld Plate (alt. ends)
                                                                                                      Design Considerations:                            Topping if
                                                                                                                                                        required
                                                             Fig.  5.3.9                                Can transfer internal diaphragm forces
                                                                                                        Will develop volume change restraint forces
                                                                                                        that must be considered in design of connection
                                                                                                      Fabrication Considerations:
                                                                                                        Slab manufacturing system must allow bottom
                                                                                                        weld inserts                                       Bearing
                                                                                                        Beam and slab inserts must align with              strip
                                                                                                        allowance for tolerance
                Design Considerations:                 Reinforcement grouted                          Erection Considerations:
                                                       in slab keyway                                   Connections can be completed by follow-up crew  P.C. or C.I.P.      with beaded
                  Can transfer internal diaphragm forces                                                                                   concrete        stud anchor
                  Can be designed as structural integrity tie
                                                                  Topping if                            Spacer may be required to make weld             beam
                                                                  required                                                                      Fig.  5.3.12
                                                                                                                          Fig. (3.17f) Connections
                Fabrication Considerations:
                  Clean and simple
                                                                                                         Design Considerations:
                                                                                                                                                     Weld plate
                                                                                                           Can transfer diaphragm shear
                Erection Considerations:                            Bearing                                Tortional and lateral beam restraint can be provided  Topping if
                                                                    strip                                  Will develop volume change restraint forces  required
                  Clean and simple                                                                         that must be considered in design of connection
                  Keyway dimensions may limit the                                                                                       Bearing
                  reinforcement diameter                                                                 Fabrication Considerations:          strip
                                                P.C. or C.I.P.
                                                        concrete                                           Slab manufacturing system must allow bottom
                                                             beam                                          weld inserts
                                                                                                           Beam and slab weld anchors must align with
                                                                                                           allowances for tolerance
                                                           Fig.  5.3.10
                                                                                                         Erection Considerations:      P.C. or C.I.P.         with headed
                                                                                                                                       concrete           stud anchors
                                                                                                           Connections can be completed by follow-up crew  beam
                                                                                                           Spacer may be required to make weld  Fig.  5.3.13
                                     Fig. (3.17e) Connections
                                                                                                                            Fig. (3.17g) Connections