SEcTION: 3 ARCHITECTURAL SUBMITTAL REQUIREMENTS SEcTION: 3 ARCHITECTURAL SUBMITTAL REQUIREMENTS
3.3 REVISIONS STAGE 3) A copy of the latest approved architectural drawings by the
Authority shall be attached for reference.
Revisions are submittals of any modification from previous approved
drawings during construction stage before issuing Building Completion 4) Scale of drawings shall be as mentioned previously.
Certificate (BCC) comprises architectural revised drawings along with
approved drawings by the Authority.
For revisions after Building Completion Certificate (BCC) please refer to
Authority Workflow.
In case the submission is a revision or an alteration during construction
stage no need for registration on e-permit. Only submittal of soft copy of
revised drawings along with documents is required.
3.3.1 Documentation:
1) Title sheet with project name and Owner/s name, plot number,
accumulated area schedule, total built-up, car park areas,
coverage area, etc., with revisions highlighted from the
approved.
2) Document sheets composed of affection plan, consultant’s
appointment letter, trade license, building permit letter and
other documents as required.
3) Owner’s signature on the title sheet, revised detailed area
calculations sheet, and main setting out / development plans.
4) Consultant’s stamp and signature shall appear on all sheets of
digital drawings.
5) In case of revisions in car park area, garbage and sanitation;
revised calculations and criteria shall be re-submitted
highlighting the changes from the approved.
3.3.2 Architectural Drawings:
1) The affected areas on already approved drawings to be
highlighted in yellow and revised areas to be highlighted
in red.
2) Any revision shall be submitted on all related drawings such as
plan, section and details.