Page 30 - Building Regulation Design Guidelines - Architecture Book (Blue Code)
P. 30
SEcTION 3 ARCHITECTURAL SUBMITTAL REQUIREMENTS SEcTION: 3 ARCHITECTURAL SUBMITTAL REQUIREMENTS
The Development Architectural Drawings submission process consists of three 4) Owner’s signature on title sheet, colored perspective/s,
main stages: detailed area calculations sheet and main setting out
/ development plans.
3.1 Concept Design Stage
3.2 Building Permit Stage 5) Project’s expected population and facilities
calculation.
3.3 Revisions Stage
6) All calculations and measurements shall be in Metric
In general, the above submittal stages shall be in electronic copy of PDF format System.
and shall be binded in one sequence. All pages of the file shall be saved in a
unified size and direction and the title block arrangements shall be as per 7) Consultant’s stamp and signature shall appear on all
Authority Standards (refer to Authority Workflow). pages of digital drawings.
Reasonable density of drawings lines and hatching in addition to all set of 8) Detailed area calculation with entire plan’s floor layout,
drawings are to be checked prior to submitting to the Authority so that it could highlighting the area for calculation in all floors(gross,
be reviewed easily. service, net and total built up areas).
9) Criteria and calculation for parking, garbage and
3.1 cONcEPT DESIGN STAGE sanitation provisions as per regulations.
3.1.1 Project Registration on e-permit 3.1.2.2 Architectural Drawings:
Obtain project ID through Project Registration on e-Permit before
submitting the concept design Drawings. (refer to Authority All drawing layouts shall provide detailed information
Workflow). such as dimensions, levels, slopes, furniture, etc.
In case those drawings were not accommodated in one
3.1.2 Concept Design Documents and Drawings sheet, key plan shall be submitted with partial drawing
layout highlighting the enlarged portion.
3.1.2.1 Documentation:
1) Title sheet as per Authority standards with project 1) Layout Plan (Scale 1:1000): showing the location of the
name, Owner/s name, plot number, coverage area, proposed development and any existing neighboring
car park, total built-up area, schedule of accumulated developments.
area, color perspective/s, etc. 2) Setting Out Plan (1:200): showing the followings
2) Brief project description of design theme and building a) The north and Qibla orientation.
usage, anticipated building population and the
environmental impact on its surroundings. b) The coordinates, dimensions and the levels of all
site services and entrances.
3) Set of documents comprising the affection plan, c) The location and setting out of all proposed
consultant’s appointment letter, trade license and buildings and other improvements including
other required documents.In case of resubmission, the access ways and car parks in relation to the
Authority’s previous comments should be included.
boundaries and required building setbacks.
28 29