Page 234 - Building Regulation Design Guidelines - Architecture Book (Blue Code)
        P. 234
     SEcTION: 24  RESPONSIBILITIES AND DISPUTES
 24.1  Neither checking of the drawings, structural calculations; nor inspection
 of the work during the progress of construction, shall be construed in
 any way to impose responsibility and/or liability on the Authority or their
 agents. The developer and his agents shall remain entirely responsible for
 all errors in the design and execution of the project and for the stability
 and safety of construction during the progress of the works and after
 completion.
 24.2  All complaints and disputes concerning building permits and the erection
 of buildings shall be referred to the Authority. Any financial disputes shall
 be referred to Dubai Court.
                                                            INDEX:
                                        FIGURES & TABLES
 232                                                                     233





